We have got an empty Brewery!

After of months of waiting we finally have our Brewery Unit emptied of someone elses rubbish. This is a great day, we can finally move in and take control of the premises, and start the hard work.

Jobs to do –

  1. Total re-wiring, 3 Phase power preparation, lighting, and 100’s of sockets.
  2. Dig drainage through car park to get to the drains.
  3. Paint the Brewery
  4. Seal the floor
  5. Seal the Rafters

So not a lot to do then…